{"page":{"id":654,"title":"Cancel or Change an Order","handle":"cancel-change-order","url":"https://jerseymill.shop/cancel-change-order/","body_html":"<p class=\"policy-updated\">Last updated: <time datetime=\"2026-11-01\">November 1, 2026</time></p>\n<p>Everyone has thrown a ball and wished they could pull it back halfway down the lane. With a Jersey Mill order you get a short window to do exactly that. This page explains how long you have to cancel an order or change it, what we can change, how to ask, and what happens if the window has already closed. Because we print personalised text exactly as you type it, and no proof is sent before production, this window matters most for names, numbers and sizes.</p>\n<section class=\"policy-summary\">\n<h2>Pulling it back: the short version</h2>\n<ul>\n<li><strong>The window:</strong> 24 hours from the moment you place your order.</li>\n<li><strong>How to ask:</strong> email <a href=\"mailto:support@jerseymill.shop\">support@jerseymill.shop</a> with your order number; we reply within 24 hours on business days.</li>\n<li><strong>What can change:</strong> sizes, colors, personalisation text, quantities, items and the shipping address.</li>\n<li><strong>Cancelling:</strong> a cancelled order is refunded in full to the original payment method.</li>\n<li><strong>After 24 hours:</strong> the order goes ahead as placed, and the 60-day return route covers you once it arrives.</li>\n</ul>\n</section>\n<h2>Your 24-hour window, explained</h2>\n<p>You can cancel or change any Jersey Mill order within 24 hours of placing it. The clock starts at the time shown on your order confirmation email, not at the start of the next business day. A Saturday-morning order therefore has a window that ends on Sunday morning, even though our replies are sent on business days.</p>\n<h3>What counts as &#8220;inside the window&#8221;</h3>\n<p>Your request is inside the window if your email reaches <a href=\"mailto:support@jerseymill.shop\">support@jerseymill.shop</a> within 24 hours of the order time. We go by the time your email arrives, not the time we answer it. So if you write on a Sunday afternoon about an order placed on Sunday morning, you are covered, even if our reply comes on Monday.</p>\n<h3>Why the window is short</h3>\n<p>Orders take 1-3 business days to prepare, and personalised shirts are printed from the text you typed into the product fields. Once a name is printed on a shirt, it cannot be unprinted. The 24-hour window gives you time to catch a typo or a wrong size while the order can still be adjusted, without holding up everyone else&#8217;s shirts.</p>\n<h2>What we can change for you</h2>\n<p>Inside the window, most parts of an order can be changed. The table below shows the common requests and what to include so we can make the change on the first reply.</p>\n<table class=\"policy-table\">\n<caption>Changes Jersey Mill can make within 24 hours of ordering</caption>\n<thead>\n<tr>\n<th scope=\"col\">Change you need</th>\n<th scope=\"col\">What to tell us</th>\n<th scope=\"col\">Good to know</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Different size</td>\n<td>The product, the player or cart line, the old size and the new size</td>\n<td>Sizes 2XL and up cost a little more; we confirm any difference before changing it</td>\n</tr>\n<tr>\n<td>Different color</td>\n<td>The product, the current color and the new color</td>\n<td>Only colors listed on the product page are available</td>\n</tr>\n<tr>\n<td>Fix a name, number or team name</td>\n<td>The cart line and the exact corrected text, in capitals</td>\n<td>Character limits on the product page still apply</td>\n</tr>\n<tr>\n<td>Add or remove sleeve text</td>\n<td>The cart line and the sleeve text, up to 10 characters</td>\n<td>Sleeve text adds $2 per shirt, charged only when filled</td>\n</tr>\n<tr>\n<td>Add or remove an item</td>\n<td>The product, size, color and any personalisation</td>\n<td>Adding a new player may be simpler as a separate order</td>\n</tr>\n<tr>\n<td>Correct the shipping address</td>\n<td>The full corrected address, including unit number</td>\n<td>Delivery is available to the US, Canada, Australia and New Zealand only</td>\n</tr>\n<tr>\n<td>Cancel the whole order</td>\n<td>The order number and the word &#8220;Cancel&#8221;</td>\n<td>Refunded in full to your original payment method</td>\n</tr>\n</tbody>\n</table>\n<h3>Changing personalisation text</h3>\n<p>This is the most common request, and the one that matters most. Say a captain typed &#8220;KOWALSKY&#8221; in the Name on back field when the bowler actually spells it &#8220;KOWALSKI&#8221;. Caught within 24 hours, it is a two-line email and we fix it. Please write the corrected text in capitals exactly as it should appear, because we print exactly what is typed. Name on back can be up to 12 characters, team name on front up to 18 characters, numbers from 0 to 99 and sleeve text up to 10 characters.</p>\n<h3>Changing a size</h3>\n<p>Picture a bowling captain who orders five Custom Team Bowling Shirts, one cart line per player, then hears six hours later that one bowler wears a 3XL rather than an XL. That is inside the window. Email us with the order number, the player&#8217;s name as it appears on the cart line and the new size. Because 2XL and up cost a little more, we tell you the difference first and only go ahead once you agree. If the bowler had mentioned it three days later instead, the order would already be on its way, and the return route described below would be the answer.</p>\n<h3>Changing a roster</h3>\n<p>On the Team Roster Back Tee you paste up to 15 names, one per line, in the Roster names field. If one of the twelve names you pasted is misspelled, or you left a player off, tell us within 24 hours and send the full corrected list, one name per line, so we can replace it in one go. We cannot add names to a shirt that has already been made, so a sub who joins mid-season needs a new order.</p>\n<h3>Changing a pickleball division or a gift order</h3>\n<p>On the Custom Pickleball League Jersey you can pick an optional Division or night choice. If your ladder moves from Thursday to Monday after you order, tell us inside the window and we switch the choice. Gift orders are another common case: if you ordered a League Night Pullover Hoodie and a Pin &amp; Ball sock pair for a partner&#8217;s birthday and want them shipped to a relative&#8217;s address in another state instead of your own, send the new address within 24 hours and we update it.</p>\n<h3>Changing a youth size</h3>\n<p>Parents often check a Custom Youth Softball Jersey against a shirt the child already wears only after the order is placed. If the youth M looks too snug next to the current shirt, email us within the window to move to a youth L or XL.</p>\n<h2>How to send a cancel or change request</h2>\n<p>All requests come in by email. There is no phone line or chat, which keeps every change in writing where both of us can see it.</p>\n<ol>\n<li>Write to <a href=\"mailto:support@jerseymill.shop\">support@jerseymill.shop</a>, or use the email link on our <a href=\"/submit-ticket/\">Submit a Ticket</a> page.</li>\n<li>Put &#8220;Cancel&#8221; or &#8220;Change&#8221; and your order number in the subject line.</li>\n<li>Send it from the email address you used at checkout if you can. If not, include that address in the message.</li>\n<li>Describe exactly what you want: which cart line, what it says now and what it should say or be instead.</li>\n<li>Wait for our written confirmation. Your change is final only once we confirm it by email.</li>\n</ol>\n<h3>A sample request that works first time</h3>\n<p>Subject: the word &#8220;Change&#8221; followed by your order number. Message: &#8220;Line 3, player name currently KOWALSKY, please change to KOWALSKI. Line 5, size XL, please change to 3XL. Everything else stays the same.&#8221; Short, specific, done. We reply within 24 hours on business days.</p>\n<h3>If you are not sure what you typed</h3>\n<p>Open the order in <a href=\"/my-account/\">My Account</a>, or look at your confirmation email. Each cart line shows the personalisation fields you filled in. Read them aloud; it is surprisingly good at catching swapped letters and missing numbers.</p>\n<h2>When the 24 hours are up</h2>\n<p>After the window closes, the order goes ahead as placed. We cannot cancel it or change sizes, colors, text or items from that point. You are still covered once it arrives.</p>\n<h3>The return route</h3>\n<p>Every item can be returned within 60 days, including personalised pieces. For a change-of-mind return we provide a free return label, and there is no restocking fee. Once the return reaches us, your refund goes to your original payment method within 7 days, or you can ask for store credit that never expires. A size swap discovered three days after ordering, or a spelling error noticed on delivery day, both follow this route. The step-by-step process is on our <a href=\"/returns-exchanges-policy/\">Returns &amp; Exchanges Policy</a> page, and the money side is on our <a href=\"/refund-policy/\">Refund Policy</a> page.</p>\n<h3>Address changes after the window</h3>\n<p>If you realise the shipping address is wrong after 24 hours have passed, email us straight away anyway. We cannot promise to change it, but contact us and we will help where we can. Our <a href=\"/shipping-delivery/\">Shipping &amp; Delivery</a> page covers what happens if a parcel cannot be delivered.</p>\n<h2>Money back when an order is cancelled</h2>\n<p>When we confirm a cancellation inside the window, we refund everything you paid for the cancelled items to your original payment method. Shipping is always free, so there is no shipping charge to recover. How quickly the refund appears on your statement depends on your bank or payment provider. If you cancel part of an order, for example one player out of five, we refund that cart line and the rest of the order continues as normal.</p>\n<h3>Changes that change the price</h3>\n<p>Some changes move the total. Swapping an L for a 2XL costs a little more; adding sleeve text adds $2 per shirt; removing sleeve text takes $2 off. We always tell you the new total before making the change. If the total goes down, we refund the difference to your original payment method. If it goes up, we explain how to pay the difference and only make the change once that is settled.</p>\n<h2>When we may need to cancel</h2>\n<p>Very occasionally we may need to cancel an order ourselves. We will always email you first to explain why, and any cancelled part of the order is refunded in full to your original payment method. Reasons can include:</p>\n<ul>\n<li>Personalisation that asks for a real team name, a league name, a brand or logo, or a famous player&#8217;s name. We cannot print trademarks or other people&#8217;s logos and names; your own team name and your own players&#8217; names are welcome.</li>\n<li>A shipping address outside the US, Canada, Australia or New Zealand, or one that cannot be delivered to.</li>\n<li>A payment we cannot confirm.</li>\n<li>A product or color that has become unavailable, or a price shown in error.</li>\n</ul>\n<p>If personalisation is the issue, we usually suggest a fix first, such as replacing a borrowed name with your own team name, so your order can go ahead. Our <a href=\"/intellectual-property-policy/\">Intellectual Property Policy</a> explains why.</p>\n<h2>Tips to avoid needing a change at all</h2>\n<p>The fastest change request is the one you never have to send. A few minutes before checkout saves everyone time.</p>\n<ul>\n<li>Watch the live preview on the product page as you type; it shows your text over the product photo.</li>\n<li>Collect names from players in writing, not over the noise at the lanes. Spellings heard over pins falling are a classic source of typos.</li>\n<li>Check sizes against the <a href=\"/size-guide/\">Size Guide</a>, especially when choosing between the women&#8217;s fit V-neck and a unisex raglan, or between youth and adult sizes.</li>\n<li>For gifts, confirm the recipient&#8217;s address, including the unit number, before you pay.</li>\n</ul>\n<h2>Reach us about a pending order</h2>\n<p>If you have just placed an order and something is not right, do not wait. Email <a href=\"mailto:support@jerseymill.shop\">support@jerseymill.shop</a> with your order number, and we will reply within 24 hours on business days. You can check the current status on our <a href=\"/order-tracking/\">Order Tracking</a> page or read more answers in the <a href=\"/faqs/\">FAQs</a>. Our business details are Jersey Mill, 3492 W Ridgecrest Dr., Taylorsville, UT 84129, US.</p>\n","visible_characters":10578,"meta_description":"Need to fix a name, number, size or address on your Jersey Mill order? Email us within 24 hours of ordering to cancel or change it before it is printed.","parent":null,"published_at":"2026-11-01T14:37:37+00:00","updated_at":"2026-11-01T14:37:37+00:00"}}